Project Description
This project had been halted for a year due to the COVID-19 pandemic. SurePods had all bathroom pods on the job site during the year-long pause, with only one floor left to set the pods in their final resting place. With each pod locked and still wrapped from shipment, the pods had been secure from the elements and ready to go once the job site reopened.