Project Description
SurePods' scope of work included manufacturing, outfitting, and installing 400 prefabricated bathrooms. By using prefabricated bathroom pods, the building team managed to compress the project’s original construction schedule by more than two months.
The LA Marriott prefabricated bathrooms were assembled in a local manufacturing facility, shipped to the site, and slid into the superstructure from the side before the erection of the facade. This innovative approach not only expedited the construction process but also ensured high-quality, consistent bathroom installations, contributing to the overall efficiency and success of the project.
In 2015 The Alliance for Quality Construction selected the building for the prestigious 2015 Q Award for the project’s outstanding contribution toward the attainment of quality construction within the building industry of Southern California. This project was also awarded LEED Silver accreditation.